bufbuild/connect-go was archived with maintenance transferred to the
ConnectRPC organization. Gitea's protobuf library for actions now uses
the ConnectRPC dependency as of v0.4.0, removing the need to continue
using the dead package.
When receiving a signal (INT or TERM) wait for running jobs to
complete instead of terminating them right away.
The new shutdown_timeout configuration setting can be used to force
the termination after a grace delay. If not specified or zero it will
shutdown immediately, for backward compatibility. It will be the case
with existing configuration files or when a configuration file is not
specified.
The config.yml created with the generate-config subcommand will
however default shutdown_timeout to 3h (same as timeout) because it is
likely what a new admin would expect: shutting down waits for jobs to
complete and not abort them.
implement: https://github.com/go-gitea/gitea/issues/24544
Changes:
- Add a global variable `tasksVersion` to store the lastest version number which returned by Gitea.
- Pass `tasksVersion` to Gitea when invoking `FetchTask`.
- If there is no task in the `FetchTask` response, store the version from the `FetchTask` response into `tasksVersion` variable.
- If there is a task in the `FetchTask` response, set `tasksVersion` to zero to focre query db in next `FetchTask` request.
Related:
- Protocol: https://gitea.com/gitea/actions-proto-def/pulls/10
- Gitea side: https://github.com/go-gitea/gitea/pull/25199
Reviewed-on: https://gitea.com/gitea/act_runner/pulls/219
Co-authored-by: sillyguodong <gedong_1994@163.com>
Co-committed-by: sillyguodong <gedong_1994@163.com>
Reviewed-on: https://gitea.com/gitea/act_runner/pulls/105
Reviewed-by: Lunny Xiao <xiaolunwen@gmail.com>
Co-authored-by: Jason Song <i@wolfogre.com>
Co-committed-by: Jason Song <i@wolfogre.com>